More than 70 projects delivered in 20 years by the Grand Tektonika Group
Selected Projects in Detail:
Construction of a bomb shelter and renovation works at an industrial site
Location: Vyshneve, Kyiv region
A dual-purpose facility was built with protective features in accordance with civil defense shelter standards.
Scope of work also included:● Construction of a product storage chamber● Reinforcement and restoration of a ramp damaged by Russian military aggression● Major façade renovation● Complete roof replacement
30+ Restaurants Nationwide
Client: McDonald’s UkraineStatus: Certified General Contractor
By the end of 2024, 30 turnkey restaurant projects have been successfully delivered across the country.
Key highlight:Project delivery time — from 60 to 120 days, from foundation to grand opening.
Yahotynske for Children – Baby Food Factory
Location: Zghurivka, Kyiv region
A full-cycle dairy-based baby food production facility with a capacity of 86,000 tons per year, delivered turnkey.
Three years later, an additional production unit was built and integrated into the plant’s operations
Scope: Post-war reconstruction of multi-storey residential buildings damaged as a result of Russian military aggression.
Location: Kyiv, Ukraine
We carried out restoration works on 9 high-rise residential buildings throughout the city.Key locations included:Reheneratorna Street, Lobanovskyi Avenue, Nauky Avenue and othersWorks included:● Structural reinforcement● Façade and window replacement● Restoration of utilities and safety systems● Returning homes to safe, livable condition
Residential Building Restoration in Kyiv
Reconstruction and Expansion for Kyivkhlib
Client: Kyivkhlib LLCLocation: Kyiv, Ukraine
We completed a set of renovation and construction works aimed at expanding and improving production operations at one of the company’s key sites.Scope of work included:● Expansion of the dispatch and logistics zone of the production facility● Renovation of the bread baking area● Construction works in the dough-mixing department
LEROY MERLIN — Building Materials Hypermarket
Location: Kyiv, UkraineClient: LEROY MERLINScope: General Contracting
A large-scale construction project delivered under general contracting terms. The 30,000 m² hypermarket was built over 13 months, meeting all corporate standards and technical requirements of the international retailer.
Project highlights:● Full-cycle construction● Engineering and utility infrastructure● Exterior and interior finishing● Site development and landscaping
Cheese Storage & Aging Warehouse for Molochniy Alliance
Location: Zolotonosha, UkraineClient: Molochniy AllianceScope: General ContractingArea: 5,500 m²Project Duration: 5 months
As of 2010, this was the largest cheese aging warehouse in Ukraine, designed and built under a general contracting agreement. The facility was constructed to meet high food industry standards, ensuring optimal conditions for long-term cheese storage and maturation.
Cheese Production Facility — Lityn
Location: Lityn, UkraineScope: Turnkey ConstructionProject Duration: 5 months
A full-cycle construction of a modern cheese production workshop was completed in just five months. Our team also optimized the project design and technical solutions, helping the client save 10% on total construction costs.
Green Team / Chumak — Vegetable Storage Facility
Location: Kakhovka, UkraineClient: Green Team LLC (Chumak brand)Scope: Structural & Cooling System InstallationStorage Capacity: 50,000 tonsProject Year: 2011As of 2011, this was the largest vegetable storage facility in Europe in terms of single-load capacity.Scope of work included:● Installation of structural steel and wall panels● Roof construction● Assembly of industrial-grade cooling systems● Solutions designed to support long-term, climate-controlled vegetable storage
Two Turnkey Supermarkets
Locations: Cherkasy & Sevastopol, UkraineScope: Turnkey ConstructionAreas: 1,500 m² and 5,000 m² respectively
We delivered two full-cycle supermarket projects in different regions of Ukraine, managing everything from permitting and construction to final commissioning.
Key highlights:● Rapid construction timelines● Engineering and utility systems integration● Interior and exterior finishing tailored to retail standards● Ready-for-operation delivery
Two Poultry Farms and Feed Mill Construction
Locations: Khmelnytskyi & Kherson regions, UkraineScope: General Construction Works
We executed general construction works for two full-cycle poultry farms and one compound feed mill, supporting end-to-end poultry production — from slaughtering to egg storage.
Facility capacities:● Poultry farms: 1.616 billion eggs per year● Feed mill: 520,000 tons of feed per year